Caldwell supplies custom beam for overpass rebuild

By Hannah Sundermeyer29 May 2020

James J. Anderson Construction (JJA) was recruited by the Commonwealth of Pennsylvania, Department of Transportation (PennDOT) for construction of a two-mile elevated roadway, with ramps, drainage and associated utilities and civil engineering works in Philadelphia, PA. The Caldwell Group provided a custom 75 foot-long, 50,000-pound capacity beam for lifting 60 rebar cages and JJA is utilizing its Anderson-owned crane fleet.

Bridger

The two-piece beam is currently being used beneath the hook of a 275-ton capacity Grove mobile crane.

The two-piece beam is currently being used beneath the hook of a 275-ton capacity Grove mobile crane to lift the large pier cap rebar cages, as required for concrete reinforcement during the rebuild of an 8,500 foot-long, 100 foot-wide overpass. The cages vary in weight, up to 46,000 pounds, and length, up to 85 feet. 

bridger 2

The 75 foot-long, 50,000-pound capacity beam is being used for lifting 60 rebar cages. The highway project is scheduled for completion next year.

“The beam was designed, manufactured and built in two sections, due to the overall pick length required,” said Tom Eicher, director of engineering, CaldwellI. “It can be used both bolted together at its full length or in individual sections, if required. The rebar cages require support at multiple points from the lifting beam by means of the lower rigging. Multiple lower rigging lugs allow riggers to distribute the weight of the cage to minimize cage deformation. This allows for proper control while handling the lifted load when positioning the rebar cage.”

He added that the upper rigging design arrangement helps further support the lifting beam. The lower lugs are sized for a minimum of three points used to pick up the load. There are 10 lower lug lift points on the full 75 foot-long assembly, while JJA can use any combination as needed to distribute the load as per their lift plans.

Caldwell supplied the two two-leg chain slings above the beam that are rigged at angles to share the load when both sections of the lifting beam are bolted together and used as an assembly. The synthetic slings above (connected to the crane’s hook) and beneath the beam (connected to the cages), are supplied by JJA. 

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
ML Crane purchases 28th Liebherr
The Liebherr LR 1600/2 will serve customers in the wind, construction, power and petrochemical markets.
FPT launches engine oils for U.S. and Canada
Genuine Engine Lubricants line formulated to meet the most advanced requirements, company said.
Sarens hoists electricity towers in Canadian mountains
Sarens hoisted powerline towers on snow covered mountains for a power line in Ontario, Canada.
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Carnes & Transport Tel: +1 512 869 8838 E-mail: d.ann.shiffler@khl.com
Matt Burke VP Sales Tel: +1 312 496 3314 E-mail: matt.burk@khl.com
CONNECT WITH SOCIAL MEDIA