act040749.xml

25 March 2008

Heerema Marine Contractors Nederland B.V. was contracted by BP America Production Co. for the installation of six deepwater pipelines and steel catenary risers (SCR). In turn, the Bayou Companies of New Iberia, LA was contracted to insulate and fabricate the pipe that will stand up for years in what is one of the world's most inhospitable environments. The pipeline lies at a working depth somewhere between 6,000 and 7,000 feet where the pressure is more than 3,000 psi and the water temperature is 4 degrees C (37 degrees F).

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Rough terrain market to see rebound
Hannah Sundermeyer compiles the latest rough terrain models to hit the North American market.
PREVIEW: SC&RA Annual Conference
The 2021 SC&RA Annual Conference, this fall in the Alamo city, promises something for everyone.
Terex RT 35-1 delievered to Antarctica
The Terex rough terrain crane was purchased to permanently support year-round scientific research.
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Carnes & Transport Tel: +1 512 869 8838 E-mail: d.ann.shiffler@khl.com
Matt Burk VP Sales Tel: +1 312 496 3314 E-mail: matt.burk@khl.com
CONNECT WITH SOCIAL MEDIA