act040749.xml

25 March 2008

Heerema Marine Contractors Nederland B.V. was contracted by BP America Production Co. for the installation of six deepwater pipelines and steel catenary risers (SCR). In turn, the Bayou Companies of New Iberia, LA was contracted to insulate and fabricate the pipe that will stand up for years in what is one of the world's most inhospitable environments. The pipeline lies at a working depth somewhere between 6,000 and 7,000 feet where the pressure is more than 3,000 psi and the water temperature is 4 degrees C (37 degrees F).

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
Two new dealers for Trail King
Trail King adds dealers in Wyoming and Illinois.
Terex unveils new rough terrain crane
The TRT 35 is a 39 ton (35 tonne) rough terrain crane available to order in early 2022
US Service Group acquires Transcope Services
A newly formed company, US Service Group is building a national rigging and machinery moving business. 
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: d.ann.shiffler@khl.com
Matt Burk VP Sales Tel: +1 312 496 3314 E-mail: matt.burk@khl.com
CONNECT WITH SOCIAL MEDIA