OSHA 1926.550 Cranes

24 April 2008

Top citations were failure to:• Furnish a crane operator's manual at the work site

•prior to operating the crane.

• •De-energizes electrical lines or maintains minimum clearance distances.

• •Obtain the manufacturer's written approval before making modifications to a crane.

• •A willful citation for not ensuring that deficient or defective parts identified by a safety inspection were not repaired or replaced before continued use of the crane.

• •Ensure that defective rigging was removed from service.

• •Operating a crane with improperly adjusted components.

• •Maintain a record and results of monthly crane inspections.

• •Clear visibility from all windows in the operators cab.

• •To provide anti-skid surfaces on all platforms and walkways on the crane.

• •To ensure that all special warnings or instructions were posted in that the controls were not labeled and load rating chart was not valid.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Latest News
A look at the Enerpac Customer Experience Days
Hannah Sundermeyer reports from the Enerpac Customer Experience Days at the new Texas facility.
SC&RA discusses likely trends in 2023
Digitization will only continue its progression across multiple fields within construction. 
ALL adds 11 all-terrain cranes
135- to 900-ton Liebherr all-terrain cranes are included in the package.
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: d.ann.shiffler@khl.com
Matt Burk VP Sales Tel: +1 312 496 3314 E-mail: matt.burk@khl.com
CONNECT WITH SOCIAL MEDIA