All Alternative Lifting/Jacking Systems Articles

First Bay Bridge transition span lifted without a hitch
After several delays, the first transition span of the new San Francisco Oakland Bay Bridge was lifted into place on February 7-8.
Jordan Pile Driving replacing steel spans
Using eight crawler cranes secured to Flexi-Float sectional barges, Mobile, AL-based Jordan Pile Driving is replacing steel spans on three CSX railroad bridges demolished by Hurricane Katrina.
Page 5 of 5